Centre For Local Research into Public Space (CELOS)


See also Site Map

Citizen-Z Cavan Young's 2004 film about the zamboni crisis

Contact

mail@celos.ca

Search


Custodians:

R.V.Burgess Park playground

46 Thorncliffe Park Dr M4H 1J7. Ward: 26, North York.
Near: S of Overlea & Thorncliffe Park

This park had most of its playground torn out in 2002, and not replaced.

RV Burgess Park Playground

R.V.Burgess Park is located right in the middle of the Thorncliffe Park Housing Development. That development was built in the early 1970's, for 12,000 people. 30,000 people live there now, many of them newcomers. The area is rich in children. The primary school right beside the park may be the largest primary school in North America -- it has over 2000 students between kindergarten and Grade 6. The schoolyard is filled with portable classrooms.

The play structure in R.V.Burgess Park was removed in 2002 and never replaced. Here is a picture gallery of what's there now.

History: In 1999, the City of Toronto conducted an inspection of every playground in city parks, and created a file on the inspectors' recommendations. Here are the photos they took of R.V.Burgess Park. The photos are linked to the recommendations.

 
RV Burgess East

RV Burgess West
Re: playground

Correspondence

From Amy Sutherland, Nov. 9 2008:

Just a question about the playground reports. I noticed in the RVBurgess East reports that they mentioned all these suggested repairs to the wooden playground in 1999. I have a feeling that the repairs weren't made and that instead they just removed it and left a big gaping hole, which is what we have had since 2003. Is there a way to figure out if they made changes or if they just took the whole thing out?

Amy Sutherland, Nov.10, 2008:

"it is just a sandy hole now"

Basically they took one park and then divided into 2 for the sake of the pictures and your report. The swings in the east part are still there (we saw them), but the playground is not, it is just a sandy hole right now. Anyways, the point is, it was good to see the pictures and realize that there used to be quite a substantial playground there and it was removed and not replaced, despite the increase in density and number of kids using the park!

From Jutta Mason, Nov.11 2008:

We got a 2003 spread sheet through Freedom of Information, about the playground CSA repair/ replacement program. The 1999 audit called for $2060 to do repairs to the Jenner Jean Marie C.C. playground (connected to their daycare?), plus $6,900 for "RV Burgess East" and $2930 for RV Burgess West. It shows that no work had been done by 2002, but then the $2930 allocation for RV Burgess West had been reduced to $0. It looks as though they had scheduled the other two "repairs" for 2002.

From Amy Sutherland, Nov. 11 2008

Wow, this is very interesting information! By contrast, another old playground in Leaside (a much more politically and economically active region of our electoral ward) was pulled out this year and replaced with a new structure in 6 months. From what I can tell from the old pictures and what we currently have, the 2 other repairs to RV Burgess West and JJMCC playground (part of the daycare) were completed.


 
May 27 2009: city's powerpoint for a public meeting about R.V.Burgess Park.

The powerpoint says that R.V. Burgess will get $100,000 in 2014 for playground equipment or waterplay. Actually the date in the 2009-2018 long-term city plan is 2015. The powerpoint says that any playground equipment before then will have to be fundraised by the community.


 
From Amy Sutherland to City Councillor John Parker, June 11, 2009

I am writing to discuss some concerns I have with the recent plans for RV Burgess Park. There is definite progress being made by PFR to beautify the park, improve the paths and provide more shade and seating. However, one of the main issues, play equipment, has still not been addressed. In the survey we completed with PFR which surveyed 167 residents, play equipment was the number one item that respondents thought was missing in the park.

1. Playground

We had hoped that the climber could be reinstalled on the green pole but were told that the price tag was too high ($15 000). The waterplay has been upgraded but the playground that was removed around 2002 has not been replaced (please see attached photo of old playground). The only hope we have been given is to wait for 2014 (12 years after the playground was removed) or raise our own money to buy our own playground. Is there really nothing else that can be done? Is there anything that you as our councillor can do?

2. Swings

The playground survey that we completed with PFR found that:

- Swings are the most used component by children 0-12 years

- Swings were the item that the most residents liked (33% of respondents)

One small measure that would help the residents of Thorncliffe THIS summer would be to put back 2 swings that were removed around 2002. In the attached photo, you will see that this swing bay in RV Burgess originally had 6 swings around 2000. 2 were removed due to new CSA regulations in 1999 that stated new minimum swing distances. However, the CSA regulations state that:

“The Children’s Playspaces and Equipment standard is not retroactive and is intended to be applied only to new playspaces equipment and to additions and replacement parts of existing playspaces and equipment.” CSA News Release, 5/14/2007 “Canadian Standards Association announces fourth edition of children’s playspaces and equipment standard.”

Putting back these 2 seats would be an extremely cost effective way of giving residents what they most value in the park, more play equipment. I know that this has been done in other City of Toronto Parks. We have already approached PFR with our request and were told no, so I am asking that you as our councillor look into this.

We appreciate the work that has been done and is promised to improve the park and don't want to take that for granted. However, I really want you to understand that for a community with only balconies and NO backyards or cottages or money for vacations, RV Burgess Park is one of the only options that residents have for recreation, leisure and connection with nature and neighbours.

I would very much appreciate an opportunity to discuss this with you in person or over the phone as there was no time at the public consultation to bring up these issues. I have also written you two emails about the proposed new paths for RV Burgess and am awaiting your reply.

From City Councillor John Parker, to Amy Sutherland, June 14 2009

Thank you for contacting me as you have done to make me aware of your thoughts with respect to the RV Burgess project.

If there is one thing I emphasize each time the matter comes up for discussion, there is absolutely no budget in place for the purpose of making improvements to RV Burgess Park.

What we are trying to do in the present exercise is (a) develop a vision for where we would like to go if money could be found to do it, and (b) do the things we can actually find money for.

Accordingly, we have to expect that things won't necessarily get done in the order of our wish list priorities; they will get done in the order in which we can find the required money. Any money that gets spent will have to be applied in accordance with the purposes for which it is authorized.

That means that, if Kiwanis provides money for a stage, we will be able to build a stage. If the Clean and Beautiful Secretariat provides money for trees and shrubs, we will be able to plant trees and shrubs. But we cannot take money that is provided under a particular category and reapply it for a different category that we might regard as more urgent.

Happy to get together with you to talk the whole thing through more fully if you like.

Also happy to hear your thoughts with respect to pathways.

Amy, as always, I appreciate the initiative that you and your group have taken in this matter, and the energy you have all put into it. I certainly don't want anyone to get the impression that the City - be it me or Parks and Rec staff - is motivated by anything other than a desire to make the park as valuable as possible to the Thorncliffe community. If time ran out at our last public meeting before things could receive a full and satisfactory review, then by all means let's get back together and keep talking.

June 18 2009, from Amy Sutherland

Asiya and I went yesterday to visit the playgrounds.

5 out of the 6 playgrounds in Ward 26 have been replaced after 1999, with the exception of Linkwood Park (which we both thought was the best playground!). There were also 2 new playgrounds installed were there was none 10 years ago.

I wonder if Linkwood would be up for replacement soon. If they insist on replacing it, maybe they could just transfer the old one here!



Wallace playground, 2014, same kind R.V.Burgess lost in 2002

R.V.Burgess July 28, 2010 -- only remnants of playground
 

The 2007 citywide waterplay budget listed $55,000 to do splash pad repairs at R.V.Burgess, sometime after 2016.

Nov.24, 2009, from Amy Sutherland, Thorncliffe Park Women's Committee, to Anna Marra, Director, Parks Development & Infrastructure Management

I am writing to inquire about Federal Stimulus Funding for RV Burgess Park (Ward 26). I am part of the Thorncliffe Park Women's Committee, we are a local citizen's group working to improve and fundraise for our neighbourhood park.

Our City Councillor, John Parker, informed us that Federal Stimulus funding was granted through for play equipment in the park.

I was told that you might be able to give us details about: - how much funding the city applied for and was awarded - what the funds will be used for

If you would be able to provide us with this information, it would be much appreciated. We are currently working on fundraising initiatives for our playground and it would help to know what money has already been granted.

Dec.2, 2009, e-mail from Mike Schreiner (Capital Projects) to Amy Sutherland

The Parks Forestry and Recreation (PF&R) Division forward a request for financial assistants in an $88,000.00 project to upgrade the waterplay in RV Burgess Park through the Infrastructure Canada program. The PF&R Division received $26,267.00 from the Federal Government and the Division is required to invest $53,333 in order to receive the funding.

The work plan approved by the Federal Government includes rehabilitation of the existing asphalt waterplay surface and electrical and mechanical components of the waterplay.

This project will have no impact on the existing play equipment in the park.


The 2009 Infrastructure Canada Program called for $200,000 for nearby Leaside Park to have a new playground, even though their existing playground was only 5 years old. After the Thorncliffe Women's Committee's sustained protest, a novel solution was found: Leaside Park's existing playground was dug up and moved to R.V.Burgess park (see cost below) and Leaside got a new playground in the same place as its old one, for $186,213.

Why the Leaside brand-new-playground replacement couldn't be switched to get a playground for R.V.Burgess: the real world of government stimulus rules.

 

Leaside playground moved to R.V.Burgess: $36,572

2010 playground spending at R.V. Burgess Park:

Construction: construct perimeter, perforated drainage and dry well: $3,750
Playground equipment: supply and instal 4 senior belt swings $8,712, supply and instal 4 junior bucket swings $6,712
Playground surface: excavation and safety surfaces $32,822
Total cost: $51,996 (Budget: $76,000)

From this description it would be impossible to tell that it involved relocating an existing nearby playground.

Note: cost of installing that exact playground at Leaside Park in 2005:
PlaySteel 4 Structure: $32,810.82
See Saw: $2,291.33,
Baby Swing: $1,779.32
Belt Swing: $1,802.96
Total cost: $38,384.42 (installation, freight, and PST included).

More RV Burgess links:

Beginning of park bazaar, 2009

http://celos.ca/wiki/wiki.php?n=Playgrounds.RVBurgessSourceMaterial


Content last modified on April 17, 2014, at 05:11 PM EST