Centre For Local Research into Public Space (CELOS)


See also Site Map

Citizen-Z Cavan Young's 2004 film about the zamboni crisis

Contact

mail@celos.ca

Search


Custodians:

posted on December 04, 2010

How to build a rail link to Pearson

A decades-long plan to launch a train service between Toronto and Pearson International Airport has become “job one” at the regional transportation agency known as Metrolinx, with officials underscoring a pledge to have it running in time for the Pan Am Games in 2015. But considerable opposition remains over the diesel-powered system that critics say should be electric. Officials insist that can’t be done by 2015. The Post’s Natalie Alcoba examines some of the finer points.

By: Natalie Alcoba
Published: November 17, 2010
Source: The National Post

What is the link?

Described as a “premium” 25-minute service that connects Pearson airport with GO stations at Weston, Bloor and Union, the Air Rail Link will operate a two-coach shuttle on the tracks used for the Georgetown South service. It will run every 15 minutes, is expected to move 5,000 passengers a day when it launches, and will add 140 trains to tracks that currently see 23 to 45 trains go by. Government officials have long touted it as a way to reduce gridlock. It is expected to cost $300-million, and fell to Metrolinx to see through after private firm SNC Lavalin couldn’t get the financing it needed. GO Transit is also spending $875-million to upgrade its infrastructure on the Georgetown South corridor by adding tracks and widening bridges.

Read more >>


Content last modified on May 27, 2011, at 06:11 PM EST